Upscheek Tashee Trail Construction Project

Public Services and Procurement Canada has awarded Hazelwood Construction Services Inc. with the contract for the Upscheek Tashee Trail Construction Project.

Award Date: 2019/05/08
Award Amount: $21,934,800.90 +GST
Start Date: June 2019
Estimated Completion Date: December 2020

The work involves a new multi-use pathway, located in the traditional territories of the Tla-o-qui-aht and Yuuthlu-ilth-ath/Ucluelet First Nation. It will extend approximately 25 km from the southern to the northern boundary of the Long Beach Unit of Pacific Rim National Park Reserve. The pathway will provide Canadians with opportunities to explore the vast sandy beaches, coastal rain forest, and special areas of natural and cultural significance in the region.

Tahsis Road Upgrade Project

The Village of Tahsis BC has awarded Hazelwood Construction Services Inc. with the contract for the Tahsis Road Upgrade Project.

Award Date: 05/08/2019
Award Amount: $2,754447.32 + GST
Start Date: June 2019
Estimated Completion Date: July 2020

The work involves road reconstruction and utility upgrades including watermain, sanitary sewers and stormwater piping on approximately 650 lm of Rugged Mountain Road, 400 lm of Alpine View Road , and 200 lm of South Maquinna Road within the Village of Tahsis BC.

Ahousaht - Wastewater Treatment Plant and Outfall

Ahousaht First Nation has awarded Hazelwood Construction Services Inc. with the contract for the Ahousaht – Wastewater Treatment Plant and Outfall.

Award Date: 04/17/2019
Start Date: April 2019
Estimated Completion Date: September 2019

The work involves civil Works for new Waste Water Treatment Plant: Installation of new pump station, supply and installation of approx. 900m of twinned forcemains and outfall pipe, storm piping, excavation and backfill for building foundations, road and parking lot construction.

Wellcox Access Road

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Wellcox Access Road project.

Award Date: 03/01/2019
Estimated Completion Date: July 2019

The project scope includes:

  • Upgraded asphalt surfacing (Front Street / Port Way / Wellcox Access Road) total of 650metres
  • Installation of storm and sani works
    Installation of a 7m wide walkway looping Wellcox Access Road to Front Street along the waterfront

Pemberton Downtown Enhancement Works

The Village of Pemberton has awarded Hazelwood Construction Services Inc. with a contract for the Pemberton Downtown Enhancement Works Project.

Award Date: 02/15/2019
Start Date: April 2019
Estimated Completion Date: July 31, 2019

This project consists of upgrading the downtown core of Pemberton by providing new water services, pavement, curb and gutter, sidewalk, street lighting, landscaping, and a rainwater-fed irrigation system.

Hammond Bay at Ivy Lane Utility Improvements

The city of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Hammond Bay at Ivy Lane Utility Improvements.

Award Date: 02/01/2019
Start Date: February 2019
Award Amount: $579,751.14
Estimated Completion Date: April 2019

The works consist of the installation of approximately 450m of watermain, 90m of sanitary sewer, 30m of storm sewer, abandonment and/or removal of existing water and sanitary mains, road and sidewalk reconstruction.

Ahousat SWMC Upgrades

Ahousat First Nation has awarded Hazelwood Construction Services Inc. with the contract for the Ahousat SWMC upgrades.

Award Date: 12/19/2018
Award Amount: $930,730
Start Date: February 2019
Estimated Completion Date: April 2019

The work involves upgrades to existing Solid Waste Management Centre. Work included: drilling and blasting, road and retaining wall construction c/w onsite production of aggregates, and relocation and modifications to existing buildings.

Port of Nanaimo Auto Terminal Civil and Electrical Works

The Nanaimo Port Authority has awarded Hazelwood Construction Services Inc. with a contract for the Port of Nanaimo Auto Terminal Civil and Electrical Works project.

Award Date: 10/24/2018
Start Date: November 1st, 2018
Estimated Completion Date: Spring 2019

The work consists of the paving of the existing site where required, relocation of site access, installation of underground, storm and sanitary sewer piping, water services, electrical conduit, installation of Owner supplied Musco lighting and bases, fencing, gates, concrete roadside barriers, pavement markings, and asphalt removal.

Brookfield – Powell Emergency Gate Structure Seismic Retrofit

Powell River Energy Inc. has awarded Hazelwood Construction Services Inc. with a contract for the Brookfield – Powell Emergency Gate Structure Seismic Retrofit project.

Award Date: 09/06/2018
Start Date: September 2019
Estimated Completion Date: January 2019

Seismic Retrofit of Existing Dam:

  • Approximately 500m3 of new cast-in-place concrete, supply and installation of tensioned rock anchors, structural steel upgrades and new gate houses.

Georgia Greenway & Harewood Utilities Projects

The city of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Georgia Greenway & Harewood Utilities Projects.

Award Date: 08/17/2018
Start Date: 09/01/2018
Award Amount: $1,601,308.77
Estimated Completion Date: 06/30/2019

The works consist of the installation of 700lm of PVC (size 200mm, 300mm) watermains, 31x water service connections, 4x fire hydrants, 280lm of sanitary (200mm & 450mm) with 10x sani services, and storm drains, curbs (285ms concrete, 30ms asphalt) and sidewalks (460lm), asphaltic concrete paving (240te trailway, 310te roadway, 40te driveway), pedestrian bridge and electrical scope of work.

`