SCOPE OF THE WORK
Approximately 48,000 square feet of the penstock steel inner liner for Units U5 and U6 will be stripped and recoated to restore its protective integrity and ensure long-term durability against corrosion and operational wear.
This is a three-stage process involving:
- High-pressure washing
- Abrasive blasting
- Relining of the penstock