West Saanich - Prospect Lake Road / Sparton Road

The District of Saanich has awarded Hazelwood Construction Services Inc. with a contract for the West Saanich – Prospect Lake Road / Sparton Road improvement project.

Award Date: 02/08/2022
Start Date: February 2022
Estimated Completion Date: August 2022

The work associated with this contract includes the construction of a new traffic signal and roadway improvements at the intersection of West Saanich
Road / Prospect Lake Road / Sparton Road. The installation of a new sidewalk / multi-use path from Goward Road to the Prospect Lake Community Hall. Scope of work includes new and rehabilitated underground utilities (watermain and storm sewer), new traffic signals, roadway lighting, roadworks and concrete works.

Otter Point Road

The District of Sooke BC has awarded Hazelwood Construction Services Inc. with the contract for the Otter Point Road project.

Start Date: September 2021
Estimated Completion Date: November 2021
Project Engineer: On point Engineering Ltd

Otter Point Road upgrade project includes a lane realignment, added/improved boulevard with new sidewalks, rock & mortar retaining walls, bike lanes, landscaping, streetlighting and upgrade in storm drain infrastructure. The road upgrade is approximately 360m in length, along Otter Point Road, extending from Sooke Road and Wadams Way.

Church Road Improvements - Sooke

The District of Sooke BC has awarded Hazelwood Construction Services Inc. with the contract for the Church Road Improvements.

Award Date: July 2021
Award Amount: $1,385,409.91
Start Date: September 2021
Estimated Completion Date: November 2021
Project Engineer: McElhanney Engineering

The scope of work includes upgrading the existing overland drainage to underground storm sewers, installation of street lighting, as well as sanitary sewer and water main modifications. The project will also include surface works such as new curb and sidewalk, road widening with the addition of bike lanes, full depth asphalt resurfacing, and landscaping.

Jordan River TIV Recoating

BC Hydro has awarded Hazelwood Construction Services Inc. with the contract for the Jordan River TIV Recoating.

Start Date: August 2021
Estimated Completion Date: August 2021

The work involves interior recoating of turbine inlet valve at Jordan River Generating Station.

Cranbrook Influent Trunk Main

The City of Cranbrook BC has awarded Hazelwood Construction Services Inc. with the contract for the Cranbrook Influent Trunk Main.

Start Date: June 2021
Estimated Completion Date: October 2021
Project Engineer: ISL Engineering

The work involves “2.5km of Sanitary Trunk Main installation including approximately the following:

· 640m of 900mm diameter
· 1235m of 750mm diameter
· 140m of 675mm diameter
· 300m of 600mm diameter
· 100m of 525mm diameter
· 30m of varying smaller size pipe to complete tie-ins and service connection

The project also includes approximately a 900mm diameter sanitary main crossing Joseph Creek, two BC Ministry of Transportation and Infrastructure Highway #3 crossings and multiple tie ins to existing sanitary infrastructure including the City sewage lagoons. Project segments are located along Victoria Avenue, Theatre Road, Ridgeview Road, 22nd Street N. and existing ROW between 22nd Street N. and the sewage lagoons in Cranbrook BC.”

Chidlow Connector

The City of Langford BC has awarded Hazelwood Construction Services Inc. with the contract for the Lazo Road Shoreline Protection and Restoration.

Start Date: June 2021
Estimated Completion Date: October 2021
Project Engineer: McElhanney Engineering

The work involves new road construction, storm sewer, box culvert, Lock block walls, electrical, paving.

Wishart Road Subdivision

Hazelwood Construction Services Inc. has been awarded with the contract for the Wishart Road Subdivision.

Start Date: May 2021
Estimated Completion Date: September 2021
Project Engineer: Westbrook Consulting

The work involves the construction of site servicing (earthworks, roadworks, sanitary sewer mains, storm drainage, service connections, street lighting, electrical ducting, and related work) for the above project. The project generally consists of approximately 200 lineal meters of new local road construction complete with curb, gutter, sidewalk, drainage, sewer, water, street lighting, Hydro, Tel, Cable and landscaping plus 320m of offsite sanitary sewer, in support of a 9 lot residential subdivision located at 3510 Wishart Road in Colwood BC.

Harby Road Subdivision

Hazelwood Construction Services Inc. has been awarded with the contract for the Harby Road Subdivision.

Start Date: May 2021
Estimated Completion Date: June 2021
Project Engineer: Herold Engineering Ltd

The work involves the development and site servicing for a 7 lot subdivision.

Union Bay Estates

Hazelwood Construction Services Inc. has been awarded with the contract for Union Bay Estates.

Start Date: April 2021
Estimated Completion Date: September 2021
Project Engineer: McElhanney Engineering

The work involves the installation of utilities, services, box culvert creek crossing, street lighting, road building, sidewalks and irrigation.

Lantzville Foothills Phase 1C

Hazelwood Construction Services Inc. was awarded with the contract for the Lantzville Foothills Phase 1C project.

Start Date: March 2021
Estimated Completion Date: September 2021
Project Engineer: McElhanney Engineering

The work involves the development and site servicing for a 26 lot subdivision.

`