Beban Plaza Utilities Upgrades

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Beban Plaza Utilities Upgrades.

Award Date: 010/28/2016
Award Amount:
Start Date: November 1st, 2016
Estimated Completion Date: April 2017
Project Engineer: McElhanney

The work consists of the installation of approximately 900m of storm and sanitary mains ranging from 150mm to 750mm in diameter, 350m2 of asphalt paving and road work.

Garner Crescent and Emery Way Utilities Upgrades

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Garner Crescent and Emery Way Utilities Upgrades.

Award Date: 07/21/2016
Award Amount: $814,609.76
Start Date: August 22nd, 2016
Estimated Completion Date: November 2016

The work consists of the installation of approximately 460m of 200mm dia. water main, 780m of 200mm dia. sanitary sewer mains, 2000m2 of asphalt paving, road work and all other work incidental thereto as shown on the drawings.

Buckley Bay Substation

BC Hydro has awarded Hazelwood Construction Services Inc. with the contract for the construction of a civil ductbank for the new Buckley Bay Substation.

Award Date: 09/02/2016
Award Amount:
Start Date: August 29th, 2016
Estimated Completion Date: October 2016
Project Engineer: McElhanney Consulting

The work involves the construction of approximately 950m of civil ductbank from the new Buckley Bay Substation near Courtenay, BC, east to Highway 19A, two rail crossings; and construction of access road from the substation, up to, and including, the rail crossing.

Lazo Road Shoreline Protection and Restoration

The City of Comox BC has awarded Hazelwood Construction Services Inc. with the contract for the Lazo Road Shoreline Protection and Restoration.

Award Date: 04/29/2016
Award Amount:
Start Date: June 13th, 2016
Estimated Completion Date: November 2016
Project Engineer: Wedler Engineering

The work involves supply and installation of approximately 2639m3 of 1000kg class rip rap and 7390m3 of 500kg class rip rap, Supply and installation of approximately 102 pieces of large woody debris, Supply and installation of approximately 796m of 3.0m wide multi-use path including ramped and stepped beach accesses, Supply and installation of materials to facilitate addition of 15 road side parking spaces, and Supply and installation of materials to facilitate finish landscaping.

Banks Ave West and Forsyth Ave Road Upgrades

The City of Parksville BC has awarded Hazelwood Construction Services Inc. with the contract for the Banks Ave West and Forsyth Ave Road Upgrades.

Award Date: 04/29/2016
Award Amount:
Start Date: June 6th, 2016
Estimated Completion Date: August 2016
Project Engineer: Timberlake-Jones Engineering

The work involves the reconstruction of approx. 200 lineal metres of roadway, on Banks Ave West including replacement of water main and installation of storm sewer, streetlights, sidewalks, and other appurtenances between Acacia Street and Finholm Street and the replacement of watermain and installation of storm sewer and services with asphalt overlay on Forsyth Avenue between Acacia Street and Finholm Street.

Victoria Road Sidewalk and Utility Upgrade

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Victoria Road sidewalk and utility upgrade.

Award Date: 04/29/2016
Award Amount: $1,113,645.45
Starting Date: June 30th, 2016
Estimated Completion Date: November 2016

This project is to construct approximately 500m of raised concrete sidewalk with landscaped boulevards, 425m of drainage piping, and 600m of sanitary piping. There will be approximately 1000m2 of asphalt utility trench road restoration and boulevard landscaping as part of this contract. There will be approximately 5000m2 of pavement removal and road grading, with paving by others.

`