BCH Long Beach Office Facility

BCH Long Beach Office Facility Omicron Construction Management Ltd has awarded Hazelwood Construction Services Inc. with a contract for the BCH Long Beach Office Facility. Award Date: 05/27/2019 Estimated Start Date: 07/07/02019 Estimated Completion Date: TBD Installation of 1300 lm of twin 250mm and 38mm HDPE waterlines c/w hot tap to existing HDPE main. Site

Bruce Ave Transportation & Utility Upgrades

Bruce Ave Transportation & Utility Upgrades The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Bruce Ave Transportation & Utility Upgrades. Award Date: 06/11/2019 Award Amount: $1,496,133.05 +GST Estimated Completion Date: TBD The works consist of the installation of 290m of PVC water mains, 570m of sanitary and

Westwood Road Subdivision – Phase 2

Westwood Road Subdivision – Phase 2 Hazelwood Construction Services Inc. has been awarded the contract for the Westwood Road Subdivision – Phase 2. Start Date: August 2019 Estimated Completion Date: November 2019 The work involves construction of a 15 Lot Subdivision: clearing and grubbing, road construction, underground utilities (storm, sanitary, water and Hydro/Tel/Cable), street lighting,

Tofino Long Beach Airport Airside Civil Project

Tofino Long Beach Airport Airside Civil Project The Alberni-Clayoquot Regional District has awarded Hazelwood Construction Services Inc. with the contract for the Tofino Long Beach Airport Airside Civil Project. Award Date: 05/27/2019 Award Amount: $4,319,475.00 +GST Start Date: June 2019 Estimated Completion Date: September 27, 2019 In general, the proposed project scope includes the following:

Upscheek Tashee Trail Bed Construction Project

Upscheek Tashee Trail Construction Project Public Services and Procurement Canada has awarded Hazelwood Construction Services Inc. with the contract for the Upscheek Tashee Trail Construction Project. Award Date: 2019/05/08 Award Amount: $21,934,800.90 +GST Start Date: June 2019 Estimated Completion Date: December 2020 The work involves a new multi-use pathway, located in the traditional territories of

Tahsis Road Upgrade Project

Tahsis Road Upgrade Project The Village of Tahsis BC has awarded Hazelwood Construction Services Inc. with the contract for the Tahsis Road Upgrade Project. Award Date: 05/08/2019 Award Amount: $2,754447.32 + GST Start Date: June 2019 Estimated Completion Date: July 2020 The work involves road reconstruction and utility upgrades including watermain, sanitary sewers and stormwater

$10K Challenge to Benefit BC Children’s Hospital

$10K Challenge to Benefit BC Children's Hospital NANAIMO, BC, May 7, 2019 -- Hazelwood Construction is officially challenging construction companies in the Nanaimo area to meet or exceed Hazelwood’s $10,000 donation to the BC Children’s Hospital Foundation. Hazelwood Construction donates to the BCCHF every year, but this year company management wants to involve the rest

Ahousaht – Wastewater Treatment Plant and Outfall

Ahousaht - Wastewater Treatment Plant and Outfall Ahousaht First Nation has awarded Hazelwood Construction Services Inc. with the contract for the Ahousaht - Wastewater Treatment Plant and Outfall. Award Date: 04/17/2019 Award Amount: Start Date: April 2019 Estimated Completion Date: September 2019 The work involves civil Works for new Waste Water Treatment Plant: Installation of

Wellcox Access Road

Wellcox Access Road The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Wellcox Access Road project. Award Date: 03/01/2019 Estimated Completion Date: July 2019 The project scope includes: Upgraded asphalt surfacing (Front Street / Port Way / Wellcox Access Road) total of 650metres Installation of storm and sani

Hammond Bay at Ivy Lane Utility Improvements

Hammond Bay at Ivy Lane Utility Improvements The city of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Hammond Bay at Ivy Lane Utility Improvements. Award Date: 02/01/2019 Start Date: February 2019 Award Amount: $579,751.14 Estimated Completion Date: April 2019 The works consist of the installation of approximately 450m of watermain,

Ahousat SWMC Upgrades

Ahousat SWMC Upgrades Ahousat First Nation has awarded Hazelwood Construction Services Inc. with the contract for the Ahousat SWMC upgrades. Award Date: 12/19/2018 Award Amount: $930,730 Start Date: February 2019 Estimated Completion Date: April 2019 The work involves upgrades to existing Solid Waste Management Centre. Work included: drilling and blasting, road and retaining wall construction

Port of Nanaimo Auto Terminal Civil and Electrical Works

Port of Nanaimo Auto Terminal Civil and Electrical Works The Nanaimo Port Authority has awarded Hazelwood Construction Services Inc. with a contract for the Port of Nanaimo Auto Terminal Civil and Electrical Works project. Award Date: 10/24/2018 Start Date: November 1st, 2018 Estimated Completion Date: Spring 2019 The work consists of the paving of the

Brookfield – Powell Emergency Gate Structure Seismic Retrofit

Brookfield – Powell Emergency Gate Structure Seismic Retrofit Powell River Energy Inc. has awarded Hazelwood Construction Services Inc. with a contract for the Brookfield – Powell Emergency Gate Structure Seismic Retrofit project. Award Date: 09/06/2018 Start Date: September 2019 Estimated Completion Date: January 2019 Seismic Retrofit of Existing Dam: Approximately 500m3 of new cast-in-place concrete,

Georgia Greenway & Harewood Utilities Projects

Georgia Greenway & Harewood Utilities Projects The city of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Georgia Greenway & Harewood Utilities Projects. Award Date: 08/17/2018 Start Date: 09/01/2018 Award Amount: $1,601,308.77 Estimated Completion Date: 06/30/2019 The works consist of the installation of 700lm of PVC (size 200mm, 300mm) watermains, 31x

Bralorne Sanitary Squamish – Lillooet Regional District

Bralorne Sanitary Squamish – Lillooet Regional District The Squamish – Lillooet Regional District has awarded Hazelwood Construction Services Inc. with a contract for the new sanitary sewer upgrades and treatment site for the town of Bralorne BC. Award Date: 07/18/2018 Award Amount: $2,400,000 Start Date: 08/20/2018 Estimated Completion Date: 12/31/2018

Ahousaht-Anderson Ck Watermain Replacement

Ahousaht-Anderson Ck Watermain Replacement Ahousaht First Nation has awarded Hazelwood Construction Services Inc. with a contract for the Ahousaht-Anderson Ck Watermain Replacement. Award Date: 07/26/2018 Award Amount: $2,880,259 Start Date: 08/07/2018 Estimated Completion Date: 11/30/2018 The construction of 1,210 metres of 200mm HDPE water supply main from the Anderson Creek Dam to Matilda Inlet near Ahousaht,

Ashlee Road Subdivision Nanaimo

Ashlee Road Subdivision Nanaimo A private contractor has awarded Hazelwood Construction Services Inc. with a contract for a 3 lot subdivision development on Ashlee Road in Nanaimo. Award Date: 05/01/2018 Start Date: 06/01/2018 Estimated Completion Date: 08/31/2018

Coal Creek Sanitary Sewer Port Alberni

Coal Creek Sanitary Sewer Port Alberni The City of Port Alberni BC has awarded Hazelwood Construction Services Inc. with the contract for the Coal Creek Sanitary Sewer 5th to 6th Avenue. Award Date: 05/16/2018 Award Amount: $1,175,678.80 + GST Start Date: Mid July 2018 Estimated Completion Date: October 2018 The work involves separating the existing combined

Village on Third Off-Site in Nanaimo

Village on Third Off‐Site A private contract has been awarded to Hazelwood Construction Services Inc. for the Village on Third Off-Site project in Nanaimo. Award Date: 04/30/2018 Start Date: May 2018 Estimated Completion Date: October 2018 The work comprises of roadworks and utility upgrades on Third Street, Hillcrest Avenue and Wakesiah Avenue – approximately 550m.

Terminal Ave Road Rehab & Surface Works

Terminal Ave Rd Rehab & Surface Works The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Terminal Ave Rd Rehab & Surface Works Project. Award Date: 02/08/2018 Award Amount: $1,995,089.92 + Tax Start Date: April 2018 Estimated Completion Date: July 2018 The work consists of the removal and installation of approximately 22,300m2 of 65mm thick

Shady Mile Subdivision

Shady Mile Subdivision A private contract awarded to Hazelwood Construction Services Inc. for a new 15 lot sub-division project. Award Date: 03/01/2018 Start Date: 03/15/2018 Estimated Completion Date: 07/31/2018

Elliott Street Sanitary Lift Station and Forcemain

Elliott Street Sanitary Lift Station and Forcemain The District of North Cowichan BC has awarded Hazelwood Construction Services Inc. with a contract for the Elliott Street Sanitary Lift Station and Forcemain. Award Date: 02/08/2017 Award Amount: $1,019,227.29 + GST Estimated Completion Date: TBD

Upgrade of Pressure Reducing Valve Stations

Upgrade of Pressure Reducing Valve Stations The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Upgrade of Pressure Reducing Valve Stations. Award Date: 02/08/2018 Award Amount: $345,825 Start Date: TBD Estimated Completion Date: TBD The work includes the construction of three (3) above ground Pressure Reducing Valve Stations consisting of

267 Westwood Road Subdivision

267 Westwood Road Subdivision A private contract in Nanaimo BC has been awarded to Hazelwood Construction Services Inc. for site servicing and road construction for a 20 Lot subdivision on Westwood Road. Start Date: 02/28/2018 Estimated Completion Date: 04/15/2018

Thicke Road Water Main Installation

Thicke Road Water Main Installation The Town of Ladysmith BC has awarded Hazelwood Construction Services Inc. with a contract for the Thicke Road Water main Installation. Award Date: 11/06/2017 Award Amount: $183,686.54 Start Date: 04/12/2017 Completion Date: 01/16/2018 Installation of approximately 220 meters of 300 mm dia. water main, including fire hydrants and appurtenances

Greendale and Rockland Road Watermain Upgrades

Greendale and Rockland Road Watermain Upgrades The Town of Lake Cowichan has awarded Hazelwood Construction Services Inc. with the contract for the Greendale and Rockland Road Watermain Upgrades. Contract amount: $719,507 (incl. GST) Award Date: Oct 17, 2017 Client: Town of Lake Cowichan Anticipated Start: Nov 15, 2017 Anticipated Completion: Feb 15, 2018 Scope: New watermain

Geo-Exchange Mine Water and Ambient Loop Pipeline Installation

Geo-Exchange Mine Water and Ambient Loop Pipeline Installation Vancouver Island University has awarded Hazelwood Construction Services Inc. with the contract for the Geo-Exchange Mine Water and Ambient Loop Pipeline Installation Award Date: 10/04/2017 Anticipated Start: November 27, 2017 Anticipated Completion: March 1, 2018 The work involves a geo-exchange minewater loop and ambient loop water pipelines installation. Project Outline

Nanaimo Terminal Avenue Utility Upgrades

Nanaimo Terminal Avenue Utility Upgrades The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Terminal Avenue Utility Upgrades Project. Award Date: 03/02/2017 Award Amount: $2,307,778.46 + Tax Start Date: April 2017 Estimated Completion Date: October 31, 2017 Project Engineer: City of Nanaimo The work involves the installation of approximately 300m of PVC DR14

Town of Qualicum Beach Poplar Avenue Watermain and Storm Sewer

Town of Qualicum Beach Poplar Avenue Watermain and Storm Sewer The Town of Qualicum Beach BC has awarded Hazelwood Construction Services Inc. with the contract for the Poplar Avenue Watermain and Storm Sewer Project. Award Date: 03/01/2017 Award Amount: $463,000.10 + Tax Start Date: May 2017 Estimated Completion Date: July 31, 2017 Project Engineer: Koers & Associates Engineering Ltd The

West Fernie Servicing and Restructure Project – Phase 2

West Fernie Servicing and Restructure Project - Phase 2 The Regional District of East Kootenay has awarded Hazelwood Construction Services Inc. with the contract for the West Fernie Servicing and Restructure Project - Phase 2. Award Date: 03/03/2017 Award Amount: $4,678,892 + Tax Start Date: April 2017 Estimated Completion Date: September 2017 Project Engineer: Kerr Wood Leidal Associates Ltd

Barrs Mountain Reservoir Replacement Project

Barrs Mountain Reservoir Replacement Project The Town of Tofino BC has awarded Hazelwood Construction Services Inc. with the contract for the Barrs Mountain Reservoir Replacement Project. Award Date: 02/23/2017 Award Amount: $821,452.08 + Tax Start Date: May 2017 Estimated Completion Date: September 2017 Project Engineer: McElhanney Consulting The work involves the supply and installation of a 1124m3 bolted steel reservoir and

Wilson Road Sanitary Sewer STEP System

Wilson Road Sanitary Sewer STEP System The Cowichan Tribes of Duncan BC has awarded Hazelwood Construction Services Inc. with the contract for the Wilson Road Sanitary Sewer STEP System. Award Date: 1/1/2017 Award Amount: Start Date: 1/1/2017 Estimated Completion Date: 2/28/2017 Project Engineer: Chatwin Engineering , Nanaimo The work consists of installing a sewer force service and tanks for

Nanaimo Airport – Aircraft Rescue and Fire Fighting Vehicle Shelter

Nanaimo Airport – Aircraft Rescue and Fire Fighting Vehicle Shelter The Nanaimo Airport has awarded Hazelwood Construction Services Inc. with the contract for the Nanaimo Airport – Aircraft Rescue and Fire Fighting Vehicle Shelter. Award Date: 23/11/2016 Award Amount: Start Date: 12/12/2016 Estimated Completion Date: Spring 2017 Project Engineer: Project managed by Durwest Construction Management , Victoria

Snuneymuxw First Nation IR#4 Sanitation & Water Upgrade

Snuneymuxw First Nation IR# 4 Gravity Sanitary Sewer and Road A Development and Onsite Watermain The Snuneymuxw First Nation of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Snuneymuxw First Nation IR# 4 Gravity Sanitary Sewer and Road A Development and Onsite Watermain. Award Date: 10/28/2016 Award Amount: Start Date: October 2016 Estimated

Beban Plaza Utilities Upgrades

Beban Plaza Utilities Upgrades The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Beban Plaza Utilities Upgrades. Award Date: 010/28/2016 Award Amount: Start Date: November 1st, 2016 Estimated Completion Date: April 2017 Project Engineer: McElhanney The work consists of the installation of approximately 900m of storm and sanitary mains ranging from

Garner Crescent and Emery Way Utilities Upgrades

Garner Crescent and Emery Way Utilities Upgrades The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Garner Crescent and Emery Way Utilities Upgrades. Award Date: 07/21/2016 Award Amount: $814,609.76 Start Date: August 22nd, 2016 Estimated Completion Date: November 2016 The work consists of the installation of approximately 460m of 200mm dia. water main, 780m

Buckley Bay Substation

Buckley Bay Substation BC Hydro has awarded Hazelwood Construction Services Inc. with the contract for the construction of a civil ductbank for the new Buckley Bay Substation. Award Date: 09/02/2016 Award Amount: Start Date: August 29th, 2016 Estimated Completion Date: October 2016 Project Engineer: McElhanney Consulting The work involves the construction of approximately 950m of civil ductbank from the new Buckley

Lazo Road Shoreline Protection and Restoration

Lazo Road Shoreline Protection and Restoration The City of Comox BC has awarded Hazelwood Construction Services Inc. with the contract for the Lazo Road Shoreline Protection and Restoration. Award Date: 04/29/2016 Award Amount: Start Date: June 13th, 2016 Estimated Completion Date: November 2016 Project Engineer: Wedler Engineering The work involves supply and installation of approximately 2639m3 of

Banks Ave West and Forsyth Ave Road Upgrades

Banks Ave West and Forsyth Ave Road Upgrades The City of Parksville BC has awarded Hazelwood Construction Services Inc. with the contract for the Banks Ave West and Forsyth Ave Road Upgrades. Award Date: 04/29/2016 Award Amount: Start Date: June 6th, 2016 Estimated Completion Date: August 2016 Project Engineer: Timberlake-Jones Engineering The work involves the reconstruction of

Victoria Road Sidewalk and Utility Upgrade

Victoria Road Sidewalk and Utility Upgrade The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Victoria Road sidewalk and utility upgrade. Award Date: 04/29/2016 Award Amount: $1,113,645.45 Starting Date: June 30th, 2016 Estimated Completion Date: November 2016 This project is to construct approximately 500m of raised concrete sidewalk

BCCSA COR Certified

BCCSA COR Certified Hazelwood Construction is proud to be recognized by the BCCSA for developing and implementing health, safety and injury management systems that meet an industry standard. Hazelwood Construction is committed to workplace safety by reducing the human and financial costs of workplace injuries.

Last Pipe Laid at Jimmie Creek

Last Pipe Laid at Jimmie Creek The Jimmie Creek Hydro project is now complete, congratulations to everyone involved in the project. This project diverts water flow via a diversion weir and intake structure on the Jimmie Creek, through a pressure pipeline on the banks of the creek, to a surface powerhouse near the confluence of