SCOPE OF THE WORK
Recoating of the interior of BR2 Penstock 2 and Unit 7 and Unit 8 scroll cases (~142,000 ft²), fabrication and install penstock modifications, and repairs to exterior coating (<500 ft²). Areas recoated include the penstock interior, turbine scroll cases interior and TIV interior. The work includes removal of silt deposits and substances detrimental to painting, surface preparation for painting, and paint application.