SCOPE OF THE WORK
- Hot tap of 350 mm AC main c/w 850m of 200-300mm PVC watermain and appurtenances along with a significant concrete pad mounted KIOSK and valve assembly.
- Minor electrical works for KIOSK.
- In addition , installation of numerous 450-600mm HDPE culverts and headwalls.
- Project includes full lane surface restoration of Boys Road.
Another exciting project for Cowichan Tribes, Chatwin Engineering and Hazelwood Construction.