![](/wp-content/uploads/2022/03/Vector-Smart-Object-copy-8.png)
PROJECT TYPE
Hydroelectric Projects
![](/wp-content/uploads/2022/03/Vector-Smart-Object-copy-8.png)
REGION/LOCATION
Port Alberni, BC
![](/wp-content/uploads/2022/03/Vector-Smart-Object-copy-8.png)
START DATE
November 2005
![](/wp-content/uploads/2022/03/Vector-Smart-Object-copy-8.png)
COMPLETION DATE
October 2015
SCOPE OF THE WORK
- Construction of a 4.7 km Penstock road in extremely steep and rugged terrain, with limited access. penstock road construction required the clearing and grubbing of a 30 m wide right-of-way, 70,000m3 of excavation, placement of 35,000m3 of Structural Fill
- Construction of 1.5 km of secondary access roads and various staging areas
Penstock Installation:
- 2,708 m of 54” HDPE Pipe (DR41, DR26 and DR 21)
- 1,768 m of 48” D.I. Pipe (PC150, PC200 and PC250)
- 200 m of 48” O.D. x 0.375” welded steel pipe c/w miter bends
`