PROJECT DETAILS
PROJECT TYPE
Hydroelectric Projects
REGION/LOCATION
Squamish, BC
START DATE
June 2022
COMPLETION DATE
June 2022
PROJECT TYPE
REGION/LOCATION
START DATE
COMPLETION DATE
Recoating the existing steel access adit door to the power tunnel of the Cheakamus Water Passage which runs 10.8km feeding 2 x 2.7m diameter penstocks. The door is located ~ 220m from the surface access portal near the Shadow Lake intake structure.