SCOPE OF THE WORK
Replacement of deep (~12m) storm drain infrastructure at the intersection of Moss Street and Point Street in the City of Victoria.
Work includes – Shoring design and excavation to grade, removal of the existing damaged storm drain pipe cleaning, installation of new reinforced concrete pipe and manhole, replacement of adjacent underground infrastructure, and surface restoration.