SCOPE OF THE WORK
The project scope is two main phases.
- Phase one is the construction of a 209,000m3 rock fill buttress to stabilize the existing lower slope of the landfill
- Phase two is the main landfill closure works which include site grading, installation of drainage items to collect leachate and runoff and geomembrane liner installation.