Seismic upgrades to gate house, coring, post tension rods, structural steel improvements.
New subdivision project that includes the installation of storm, sani, water, sani lift station, retaining walls, roadwork, curb, sidewalk, paving, electrical and lighting.
The work associated with this contract includes the construction of a new traffic signal and roadway improvements at the intersection of West Saanich
Road / Prospect Lake Road / Sparton Road. The installation of a new sidewalk / multi-use path from Goward Road to the Prospect Lake Community Hall. Scope of work includes new and rehabilitated underground utilities (watermain and storm sewer), new traffic signals, roadway lighting, roadworks and concrete works.
The work involves “2.5km of Sanitary Trunk Main installation including approximately the following:
· 640m of 900mm diameter
· 1235m of 750mm diameter
· 140m of 675mm diameter
· 300m of 600mm diameter
· 100m of 525mm diameter
· 30m of varying smaller size pipe to complete tie-ins and service connection
The project also includes approximately a 900mm diameter sanitary main crossing Joseph Creek, two BC Ministry of Transportation and Infrastructure Highway #3 crossings and multiple tie ins to existing sanitary infrastructure including the City sewage lagoons. Project segments are located along Victoria Avenue, Theatre Road, Ridgeview Road, 22nd Street N. and existing ROW between 22nd Street N. and the sewage lagoons in Cranbrook BC.”
The work involves new road construction, storm sewer, box culvert, Lock block walls, electrical, paving.
The work involves the development and site servicing for a 26 lot subdivision.
Offsite and Onsite servicing, siteworks and surface works for 5 acre private development site. Site will ultimately have 6 townhomes, an apartment building and a BC Housing Complex.
3 year replacement program to upgrade aging steel penstock at Boralex’s Ocean Fall Hydroelectric project.
4500mm of rain annually.
Demolition, removal and disposal of sections of Penstock 1 and installation of new HDPE waterline, including lock block wall and pipe bridge.
This project consists of civil works for Pexsisen and Centre Mountain Lellund Schools in Langford BC. Hazelwood is the subcontractor for Farmer Construction who is the General Contractor building the schools. The civil works involve excavation for buildings and site servicing.