Upgrading roadworks and installing a community trail at Rockwood Heights in Nanaimo BC.
- Two phased construction of a 4 lane roadway including 18 m long bridge over the Millstone River complete with pre-cast concrete box girders, cast-in-situ concrete abutments, steel railings and hangers for suspension of utilities
- Demolition and removal of existing bridge structure
- MSE Wall Construction
- Reconfiguration of 2 intersections complete with temporary and new intersection signalization and lighting – Bowen Road at Pryde Avenue and Bowen Road at Buttertubs
- Traffic control and establishment of detours to accommodate traffic flow of approximately 16,000 vehicles per day through construction site
- Construction of new roads and reconstruction of existing roads complete with new concrete curbs, sidewalks, asphalt paving and signage
- Supply and installation of new underground infrastructure (i.e. water, storm and sanitary sewers, electrical, etc.) requiring extensive shoring of deep excavations and by-pass pumping of live sewage
- Excavation and removal of contaminated soils
- Landscaping
- Design and construction of a site office/storage building
- Construction of a household hazardous waste building
- Site preparation and road construction
- Clearing and grubbing
- Rock excavation including drilling and blasting
- Construction of concrete lock block walls complete with supply and installation of steel railings, gates and baffles
- Manufacturing (i.e. crushing and screening) of construction aggregates for road and site embankment fills and for final surfacing
- Site grading and drainage
- Construction of a 60 Lot Subdivision for the remote First Nations Community of Ahousaht, located on Flores Island off the coast of Vancouver Island near Tofino, BC.
- Supply and Installation of underground infrastructure: storm, sanitary, water and electrical utilities
- Construction of a sewage pump station c/w building
- Clearing and grubbing – 12 Hectares
- Overburden stripping and common excavation – 110,000 m3
- Quarry Development – Drilling and Blasting Rock – 100,000 m3
- Production and placement of specified aggregates for roads and lot fill – 130,000 m3
- Asphalt Paving – 15,000 m2
- Street Lighting and Landscaping
- Environmental Mitigation
- Construction of a new Sport Fields Facility with seven (7) Baseball Fields and two (2) Soccer Pitches
- Clearing & Grubbing, Top Soil Stripping (30,000m3, Cut/Fill Excavation (27,000m3) & Import Granular Fill (30,000m3)
- Sanitary sewer system, watermain system, site drainage and electrical system facilities
- Supply and installation of complete Irrigation System Facilities
- Rootzone Medium (over 67,600m2 with 40,910te of material placed)
- Skinned Infields (7) c/w Pitcher Mounds (5)
- Gravel Surfacing: Parking Lots, Access Roads and Footpaths (13,800m2)
- Chain Link Fencing & Gates (2,725lm)
- Turf Grass Establishment and Maintenance
- Environmental Management and Quality Management
- Construction and Re-establishment of a natural coastal dune, including the import of 3,000 m3 of sand, gravel, and cobbles, as well as the placement of natural beach logs and the planting of over 3000 native shoreline and riparian plants.
- This project transformed a coastline with outdated and unsightly hard-source coastal armoring into a beautiful and sustainable soft-shoreline.
- Road and Parking Lot Construction, including 13,000 m3 of organic stripping, 52,000 m3 cut and fill to embankment, 14,000 m2 of road gravels and paving and 8,000m2 of hydro-seeding
- Supply and Installation of underground infrastructure: storm, sanitary and water and electrical utilities
- Street lighting
- Staged construction and detours to allow uninterrupted access to mall by patrons
- This project is to construct approximately 500m of raised concrete sidewalk with landscaped boulevards, 425m of drainage piping, and 600m of sanitary piping.
- There will be approximately 1000m2 of asphalt utility trench road restoration and boulevard landscaping as part of this contract.
- There will be approximately 5000m2 of pavement removal and road grading, with paving by others.
The work involves supply and installation of approximately 2639m3 of 1000kg class rip rap and 7390m3 of 500kg class rip rap, Supply and installation of approximately 102 pieces of large woody debris, Supply and installation of approximately 796m of 3.0m wide multi-use path including ramped and stepped beach accesses, Supply and installation of materials to facilitate addition of 15 road side parking spaces, and Supply and installation of materials to facilitate finish landscaping.
Subdivision development including site development including site servicing to property line and Roadway development.
- Clearing and grubbing (2012: 14,184m2 + 2016: 4316m2) , and drilling and blasting of rock (2012: 30,600m3, 2016: 6000m3)
- Install Sanitary sewer mainline and Sanitary sewer services to property line (2012: 453lm, 2016: 255lm)
- Install Storm sewer mainline and Storm sewer services to property line (2012: 477lm, 2016: 246lm)- Install Water mainline and Water services to property line (2012: 707lm, 2016: 225lm)
- Install street lighting (2012: 555lm, 2016: 185lm, BC Hydro-Telus-Shaw-Gas ducting (2012: 800lm, 2016: 250lm)
- Install curbs (2012: 883lm, 2016: 373lm), sidewalks (2012: 865m2, 2016: 300m2) and asphalt roadway (2012: 5600m2, 2016: 1472m2)