New sanitary Sewer upgrades and treatment site for the Town of Bralorne BC. The project work consisted of the following:

Roadworks and utility upgrades on Third Street, Hillcrest Avenue and Wakesiah Avenue. The project scope consisted of:

The work involved separting the existing combined sewer from 5th and 6th Ave between Montrose St. and Melsrose St., in Port Alberni BC. This included the supply and installation of approximately 350 metres of 300 & 375mm Dia. PVC gravity sewer, 160 metres of 600 & 900mm dia. concrete storm sewer, manhole, services and alterations to the existing 900mm dia. combined sewer.

540 m of approach roadwork including:

Recoating of the interior of BR2 Penstock 2 and Unit 7 and Unit 8 scroll cases (~142,000 ft²), fabrication and install penstock modifications, and repairs to exterior coating (<500 ft²). Areas recoated include the penstock interior, turbine scroll cases interior and TIV interior. The work includes removal of silt deposits and substances detrimental to painting, surface preparation for painting, and paint application.

Seismic Retrofit of Existing Dam. Work included approximately 500m3 of new cast-in-place concrete, supply and installation of tensioned rock anchors, structural steel upgrades and new gate houses.

`