Municipal infrastructure project for District of Sooke involving upgrades to Charters Rd between Golledge Ave and Troup Road. Works include storm, water, and sani force main upgrades, road reconstruction with new curbs and sidewalks, the removal of failing CSP culverts and replacement with culvert box culvert and stream bed riprap upgrades, construction of 650 m2 of redi rock concrete block retaining wall to 8m high, disposal and replacement of significant volumes of contaminated soil.

Project involves underground utility upgrades including installation of new watermain, sanitary sewer and storm sewer with associated new services to properties. There is also approximately 60 meters of sanitary sewer main re-lining works to be done by folded/formed PVC trenchless operations. Upgrades to surface infrastructure including curbing, sidewalks and roadways.

Excavation for 2 ownhouse buildings approximately 7000 ft2 each. Ultimately expected to be 3X as there are 6 buildings to do, but for the moment the contract is for 2.

Replacement of approximately 530m of existing watermain with new PVC watermain, associated fittings, service connections and tie-ins. Repair and restoration of the associated lengths of road including approximately 2,900m2 of new asphalt paving.

New/Upgrading watermain and water services for City of Courtenay.

Run of the River hydro project for Dzawada’enuxw First Nation.

Road access to NPA, Vancouver Island Ferry and Heliport along with streetlighting, storm, sani and water upgrades and the creation of additional parking lot area for Vehicle Processing Centre.

`