Removal and replacement of sanitary sewer piping, manholes and services. Installation of water mains and services. Supply and installation of large community septic tanks and large rock revetment. Road and drainage upgrades.

Installation of a 4.8km long, 1-meter diameter steel pipeline supplying drinking water to Courtenay-Comox

The scope of work is widening McCallum Road to the north and installing two new signalized intersections at the entrances to Costco. Elements of this include:

• Clearing and stripping
• Rock blasting and removal
• Common excavation
• Installation of utilities (water, sanitary sewer and storm drain, including manholes,
headwalls and catch basins)
• Construction of retaining walls (pre-shear Wall, cast in place wall, lower gravity
wall, rock mortar wall, concrete infill wall)
• Asphalt paving
• Curb and gutter, concrete islands, sidewalks and handrails
• Pavement marking and signage
• Landscaping (tree and artificial turf) and irrigation installation
• Streetlight bases, signal bases, conduit and lane lights
• Coordination with utilities (BC Hydro, Fortis, Telus, and Shaw)

Bulk earthworks and drill and blast 232,000m3 of rock. Offsite hauling of 100,000m3 of rock and 10,000m3 of till. Supply and install 5000m2 of Redi-Rock retaining walls up to 18.5m tall. Crush and screen 90,000m3 of aggregates from onsite rock.

Construction of new parking lots and access road from Highway 1 to Malahat Skywalk tourist attraction. Work includes land clearing, drilling & blasting, watermains, buried electrical conduit, culevert and site drainage.

Construction approximately 850m of new paved road, 1km of new watermain c/w services to lots, drainage ditches, culverts and lot grading for new commercial/industrial subdivision.

The work involves civil Works for new Waste Water Treatment Plant: Installation of new pump station, supply and installation of approx. 900m of twinned forcemains and outfall pipe, storm piping, excavation and backfill for building foundations, road and parking lot construction.

The work consists of portions of road widening; concrete curb, gutter, sidewalk, and traffic islands; street lighting; a signalized intersection; storm sewer mains and catch basins; sanitary sewer main; water distribution mains and services; road works and paving; concrete cast in place retaining wall

The work consists of paving of existing site where required, relocation of site accesses, installation of storm and sanitary sewers, water main and services, underground electrical, Musco lighting and bases, fencing, gates, concrete roadside barriers, pavement markings, and asphalt removal.

`