The Alberni-Clayoquot Regional District has awarded Hazelwood Construction Services Inc. with the contract for the Tofino Long Beach Airport Airside Civil Project.

Award Date: 05/27/2019
Award Amount: $4,319,475.00 +GST
Start Date: June 2019
Estimated Completion Date: September 27, 2019

In general, the proposed project scope includes the following:

  • Concrete Panel Replacement/Rehabilitation of Apron II and Taxiway ‘C’, Apron III, Taxiway ‘F’ and Taxiway ‘H’
  • Culvert Replacements beneath Taxiway ‘C’ and Taxiway ‘F’
  • Route and Seal Concrete Cracks and Joints
  • Concrete Milling
  • Supply and Place HMAC and Line Markings
  • Sawcut and Seal Asphalt Joints
  • Drainage Works, incl. Guided Bore of Smooth Wall Pipe
  • Restoration Works with Topsoil and Hydroseed
`