Wilson Road Sanitary Sewer STEP System
The Cowichan Tribes of Duncan BC has awarded Hazelwood Construction Services Inc. with the contract for the Wilson Road Sanitary Sewer STEP System.
- Award Date: 1/1/2017
- Award Amount:
- Start Date: 1/1/2017
- Estimated Completion Date: 2/28/2017
- Project Engineer: Chatwin Engineering , Nanaimo
The work consists of installing a sewer force service and tanks for three homes. Including approx 165 LM of 50 mm DR 9 HDPE sewer; connection to existing systems; 2 unit of 50 mm gate valve; flushout assembly; 3 unit of service connections (32 mm); 450 SM of clearing and grubbing; geotechnical engineering testing; 67 LM of regrade ditching; pump chamber, pump, control panel, electrical (single family); sewer system mainline; 1 unit septic tank 2,200 GAL; 2 unit septic tank 1,700 GAL; 3 unit connect to existing service.