CVRD Treated Water Transmission Main

Hazelwood Construction Services Inc. has been awarded with a contract for the CVRD Treated Water Transmission Main.

Award Date: April 2020
Estimated Completion Date: October 2020

This project consists of the installation of a 4.8km long, 1-meter diameter steel pipeline supplying drinking water to Courtenay-Comox.

Malahat Skywalk

The Malahat Sky Walk Corp. has awarded Hazelwood Construction Services Inc. with a contract for the Malahat Skywalk parking lot and access road development.

Award Date: 12/20/2019
Estimated Completion Date: July 2020

This project consists of and clearing, drilling & blasting, placing rock fill to construct parking lot and new paved access road from Hwy 1 down to the Malahat Skywalk tourist attraction.

City Gate McCallum Road

Seacliff Properties (Langford) Ltd c/o Keycorp Developments Ltd has awarded Hazelwood Construction Services Inc. with a contract for the City Gate McCallum Road Works Project.

Award Date: 12/09/2019
Start Date: January 2020
Estimated Completion Date: November 2020

The scope of work is widening McCallum Road to the north and installing two new signalized intersections at the entrances to Costco. Elements of this include:

• Clearing and stripping
• Rock blasting and removal
• Common excavation
• Installation of utilities (water, sanitary sewer and storm drain, including manholes,
headwalls and catch basins)
• Construction of retaining walls (pre-shear Wall, cast in place wall, lower gravity
wall, rock mortar wall, concrete infill wall)
• Asphalt paving
• Curb and gutter, concrete islands, sidewalks and handrails
• Pavement marking and signage
• Landscaping (tree and artificial turf) and irrigation installation
• Streetlight bases, signal bases, conduit and lane lights
• Coordination with utilities (BC Hydro, Fortis, Telus, and Shaw)

WLEMS – Bulk Earthworks & Grading

The Sooke School District 62 has awarded Hazelwood Construction Services Inc. with a contract for the WLEMS – Bulk Earthworks & Grading project.

Award Date: 11/26/2019
Estimated Completion Date: November 2020

This project consists of bulk earthworks grading, drill and blast 232,000m3 of rock. Offsite haul, 100,000m3 of rock and 10,000m3 of till. Supply and install 5000m2 of retaining wall up to 18.5m tall. Crushing and screening 90,000m3 of material for use onsite.

Cedar Road Watermain

The North Cedar Improvement District has awarded Hazelwood Construction Services Inc. with a contract for the Cedar Road Watermain Replacement.

Award Date: 11/15/2019
Award Amount: $581,000
Estimated Start Date: January 20, 2020
Estimated Completion Date: March 31, 2020

This project includes the replacement of 720 lm of 250 mm diameter watermain, appurtenances and services and repaving of 720 lm of southbound driving lane.

Ahousaht Roads and Drainage

Ahousaht First Nation has awarded Hazelwood Construction Services Inc. with the contract for the Ahousaht Roads and Drainage.

Award Date: 11/09/2019
Start Date: November 2019
Estimated Completion Date: May 2020

The work involves roadworks and paving of 4000 m2 of residential roads, construction of 1000m of ditches, and installation of 200m of driveway culverts in the remote community of Ahousaht, BC.

BCH Long Beach Office Facility

Omicron Construction Management Ltd has awarded Hazelwood Construction Services Inc. with a contract for the BCH Long Beach Office Facility.

Award Date: 05/27/2019
Estimated Start Date: 07/07/02019
Estimated Completion Date: TBD

Installation of 1300 lm of twin 250mm and 38mm HDPE waterlines c/w hot tap to existing HDPE main. Site construction and servicing for 2 acre BC Hydro office and Warehouse facility.

Bruce Ave Transportation & Utility Upgrades

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with a contract for the Bruce Ave Transportation & Utility Upgrades.

Award Date: 06/11/2019
Award Amount: $1,496,133.05 +GST
Estimated Completion Date: TBD

The works consist of the installation of 290m of PVC water mains, 570m of sanitary and storm drains, curbs and sidewalks, segmental and block retaining walls, asphaltic concrete paving, road marking, street lighting.

Westwood Road Subdivision – Phase 2

Hazelwood Construction Services Inc. has been awarded the contract for the Westwood Road Subdivision – Phase 2.

Start Date: August 2019
Estimated Completion Date: November 2019

The work involves construction of a 15 Lot Subdivision: clearing and grubbing,
road construction, underground utilities (storm, sanitary, water and Hydro/Tel/Cable), street lighting, etc.

Tofino Long Beach Airport Airside Civil Project

The Alberni-Clayoquot Regional District has awarded Hazelwood Construction Services Inc. with the contract for the Tofino Long Beach Airport Airside Civil Project.

Award Date: 05/27/2019
Award Amount: $4,319,475.00 +GST
Start Date: June 2019
Estimated Completion Date: September 27, 2019

In general, the proposed project scope includes the following:

  • Concrete Panel Replacement/Rehabilitation of Apron II and Taxiway ‘C’, Apron III, Taxiway ‘F’ and Taxiway ‘H’
  • Culvert Replacements beneath Taxiway ‘C’ and Taxiway ‘F’
  • Route and Seal Concrete Cracks and Joints
  • Concrete Milling
  • Supply and Place HMAC and Line Markings
  • Sawcut and Seal Asphalt Joints
  • Drainage Works, incl. Guided Bore of Smooth Wall Pipe
  • Restoration Works with Topsoil and Hydroseed
`