Bralorne Sanitary Squamish – Lillooet Regional District

The Squamish – Lillooet Regional District has awarded Hazelwood Construction Services Inc. with a contract for the new sanitary sewer upgrades and treatment site for the town of Bralorne BC.

Award Date: 07/18/2018
Award Amount: $2,400,000
Start Date: 08/20/2018
Estimated Completion Date: 12/31/2018

Ahousaht-Anderson Ck Watermain Replacement

Ahousaht First Nation has awarded Hazelwood Construction Services Inc. with a contract for the Ahousaht-Anderson Ck Watermain Replacement.

Award Date: 07/26/2018
Award Amount: $2,880,259
Start Date: 08/07/2018
Estimated Completion Date: 11/30/2018

The construction of 1,210 metres of 200mm HDPE water supply main from the Anderson Creek Dam to Matilda Inlet near Ahousaht, B.C. The work includes but is not limited to:

• 1,210 metres of water mains
• 1,126 metres of access road construction
• Rock blasting, crushing, screening
• Bridge construction

Ashlee Road Subdivision Nanaimo

A private contractor has awarded Hazelwood Construction Services Inc. with a contract for a 3 lot subdivision development on Ashlee Road in Nanaimo.

Award Date: 05/01/2018
Start Date: 06/01/2018
Estimated Completion Date: 08/31/2018

Coal Creek Sanitary Sewer Port Alberni

The City of Port Alberni BC has awarded Hazelwood Construction Services Inc. with the contract for the Coal Creek Sanitary Sewer 5th to 6th Avenue.

Award Date: 05/16/2018
Award Amount: $1,175,678.80 + GST
Start Date: Mid July 2018
Estimated Completion Date: October 2018

The work involves separating the existing combined sewer from 5th to 6th Ave between Montrose St. and Melrose St., in Port Alberni, BC. This includes the supply and installation of approximately 350 meters of 300 & 375mm dia. PVC gravity sewer, 160 meters of 600 & 900mm dia. concrete storm sewer, manholes, services, and alterations to the existing 900mm dia. combined sewer.

Village on Third Off‐Site

A private contract has been awarded to Hazelwood Construction Services Inc. for the Village on Third Off-Site project in Nanaimo.

Award Date: 04/30/2018
Start Date: May 2018
Estimated Completion Date: October 2018

The work comprises of roadworks and utility upgrades on Third Street, Hillcrest Avenue and Wakesiah Avenue – approximately 550m. The work package includes the following: watermain, storm sewer and sanitary sewer
upgrades; new services to property line; roadway reprofiling; frontage works; curbs; sidewalks; street lighting; underground hydro/tel/cable works; landscaping, and associated appurtenances.

Terminal Ave Rd Rehab & Surface Works

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Terminal Ave Rd Rehab & Surface Works Project.

Award Date: 02/08/2018
Award Amount: $1,995,089.92 + Tax
Start Date: April 2018
Estimated Completion Date: July 2018

The work consists of the removal and installation of approximately 22,300m2 of 65mm thick asphaltic concrete pavement, the installation of 2050 tonnes of base course, 1550m2 of 75mm thick asphaltic concrete pavement, 290m2 of concrete sidewalk, 600m of concrete curb, 460m2 of concrete medians, pedestrian islands, and ramps, road markings, traffic signs, pedestrian flashers, traffic signal upgrades, landscaping, irrigation, and all other work incidental thereto as shown on the drawings.

Shady Mile Subdivision

A private contract awarded to Hazelwood Construction Services Inc. for a new 15 lot sub-division project.

Award Date: 03/01/2018
Start Date: 03/15/2018
Estimated Completion Date: 07/31/2018

Elliott Street Sanitary Lift Station and Forcemain

The District of North Cowichan BC has awarded Hazelwood Construction Services Inc. with a contract for the Elliott Street Sanitary Lift Station and Forcemain.

Award Date: 02/08/2017
Award Amount: $1,019,227.29 + GST
Estimated Completion Date: TBD

Upgrade of Pressure Reducing Valve Stations

The City of Nanaimo BC has awarded Hazelwood Construction Services Inc. with the contract for the Upgrade of Pressure Reducing Valve Stations.

Award Date: 02/08/2018
Award Amount: $345,825
Start Date: TBD
Estimated Completion Date: TBD

The work includes the construction of three (3) above ground Pressure Reducing Valve Stations consisting of the supply and installation of all PRV station components as shown on the contract drawings including all valves, fittings, watermain piping and appurtenances, storm sewer piping, reinforced
concrete slab, above ground kiosk enclosure, electrical installations and underground electrical service.

267 Westwood Road Subdivision

A private contract in Nanaimo BC has been awarded to Hazelwood Construction Services Inc. for site servicing and road construction for a 20 Lot subdivision on Westwood Road.

Start Date: 02/28/2018
Estimated Completion Date: 04/15/2018

`