PROJECT DETAILS

PROJECT TYPE
Current Projects
REGION/LOCATION
Gilford Island, BC
START DATE
November, 2026
COMPLETION DATE
March, 2027

SCOPE OF THE WORK

Construction of shoreline protection on 3 pocket beaches (North Beach, Middle Beach, and South Beach) within Gwa’yas’dums Village on Gilford Island. The shoreline protection includes lock block sea walls, armour rock and beach nourishment material over 283m of shoreline. The work also includes construction of 108 m of boardwalk, pre-cast concrete beach access stairs, and 4 wooden Awak’was (cultural viewing platforms/ meeting places) along the shoreline, supported by steel piling.

`