Haa-ak-suuk Hydro Project

REGION / LOCATION

Sutton Pass, Vancouver Island

PROJECT TYPE

Hydroelectric Projects

COMPLETION DATE

April 2014

SCOPE OF WORK

General Contractor for construction of a 6 MW hydroelectric project that included the construction of:

  • Concrete intake and weir structure c/w Coanda screen and gates.
  • Powerhouse and switchyard concrete foundations and miscellaneous metals.
  • 900 mm dia. steel penstock (3.1 km) and 1,070 mm dia. HDPE penstock (0.5 km), including three major buried creek crossings, two of them at waterfalls.