Active Transportation improvements, including protected bike lanes, traffic calming measures, new traffic signals, and pavement markings.
Replacement of approximately 480m of storm sewers and culvert rehabilitation with slip lining, including installation of new headwalls, catch basins and manholes, and treatment facility located airside and landside at Victoria International Airport.
- Replacement of sanitary sewers with removal and installation of approx 560m of 200mm diameter pvc pipe, manholes and service connections.
- Upgrade of storm sewers with the installation of approx 360m of 600mm diameter or smaller pvc pipe, manholes and service connections.
- Repair & restoration of road structure including 4300m2 of paving.
The scope of work includes
- Replacing 1,221 meters of sanitary main, sanitary manholes and sanitary services
- Installing 503 meters of storm main
- Catch basins and lawn basins
- Replacing 5,303 square meters of asphalt pavement
- Placing 802 meters of concrete sidewalk
- Curb and gutter
- Streetlights and restorations
- Excavation, Installation, and backfill for new pre-cast concrete lift station
- Installation of new sanitary gravity main and services
- Installation of new sanitary forecemain
- Site restoration, paving, concrete sidewalk, etc.Municipal
- Site Clearing, Common Excavation, Drilling & Blasting, Road Building, Watermain and Tech Cable Installation
- Construct new 1,400m3 steel water reservoir, and demolish old reservoir
- Supply & Install new pumps at existing WTP, and PRVs in affected residences
Working as a sub-contractor on BC Ferries (Heriot Bay & Whaletown berths):
- Supply & install lockblock abutments
- Excavation for shoreline re-armouring & abutment installations
- Demolition of existing structures (toll booth/electrical building)
- Electrical conduit installation c/w trenching & backfill, an
- Extending of CSP outfall
Water Conveyance Upgrades:
- Watermain Installation
- Sanitary Gravity & Forcemain Installation
- Bridge Installation
- Lift Station Installation
- Pump Station Building Construction
Civil works for a new 51 lot subdivision on a 6 Hectare site in Nanoose Bay.
Works include:
- Rock Blasting
- Mas Excavation and Fill,
- Installation of water,
- Sani, storm, and hydro/tel utilities
- Concrete Curbs
- Sidewalk and road paving
Work also involves expansion of storm water management ponds in environmentally sensitive area.
- Approximately 3.4km of sanitary forcemain
- Approximately 1.0km of new gravity sewer main
- 13 new/ build over manholes.
- Roadway widening for shared lanes along Wallace Drive including approximately 2500m2 of asphalt pavement, 1000m2 of concrete sidewalk, 685m of concrete curb and gutter, 1140m of concrete roadside barrier.
- Replacement of various drainage culverts, including extension of an existing large concrete box culvert in Graham Creek.