Sombrio No.3 Bridge Replacement

REGION / LOCATION

Port Renfrew, BC

PROJECT TYPE

Heavy Civil Construction

COMPLETION DATE

October 2009

SCOPE OF WORK

  • Construction of a 25 m long pre-cast concrete box girder bridge with cast-in-situ concrete abutments

540 m of approach roadwork including:

  • Clearing and grubbing
  • 22,000 m3 of excavation
  • Production and placement of road gravels
  • Paving
  • Traffic control, including detours
  • Design, supply and installation of 958 m2 of MSE retaining walls, complete with manufacturing of required gravels