PROJECT DETAILS

PROJECT TYPE
Current Projects
REGION/LOCATION
Courtenay, BC
START DATE
December, 2025
COMPLETION DATE
TBA

SCOPE OF THE WORK

Install water main, sewer and storm drain including clean outs, perimeter drains and systems not directly entering the building but to within .8m to 1m of the building for those services that enter the building perimeter.

Other work to include ESC measures, protection fencing, demo and disposal of existing home & carriage house on site, removal of ex watermain, storm and sewer piping, clearing, grubbing & stripping of site, bulk excavation and backfill of building footprint. Supply of asphalt, line painting and concrete (wheel stops, curbing & flat surface concrete). Coordination with other subs (Mechanical, Electrical, Landscaping) including trenching, bedding and backfilling.

`